|
|
|
|
|
|
|
|
|
|
|
|
|
|
1. Steam turbines with the power up to 100 MW
Overhauls are performed in the full cycle comprising:
• before overhaul diagnosis
• determining the range of overhaul
• repairs or modernisation
• acceptance measurements
• after overhaul service
2. Steam and water boilers for the power up to 315 MW (430t/h)
Realisation of overhauls in the full cycle:
• before overhaul diagnosis
• determining the range of overhaul
• repairs or modernisation
• acceptance measurements
• after overhaul service
3. Auxiliaries
• pumps
• fittings of boilers up to Pn=25,0 MPa, t=565°C
• devices for chemical water conditioning
• devices for unioading and transportation of coal (wagon tipper, band conveyers, multi-bucket loaders)
• feeders for the row coal
• coal mills
• mechanical grates
• pipelines of air-dust mixture
• burners
• air and combustion gases channels
• blast air ventilators
• rotating air heaters
• mills ventilators
• draught ventilators
• electrofilters
• cyclones and multicyclones
• devices of ash removal and dislagging (pumps, installations, retention reservoirs)
• boiler brickwork's, isolations
• heat exchangers
• pressure vessels
|
|
|
|
|
|
|
|